Step 1: Find the lowest point on the floor line. Make a mark one tile height from the floor. |
Step 2: Nail a batten with a true edge on the mark. Check with spirit level to determine horizontal. |
 |
 |
Step 3: Set out a row of tiles across the wall and adjust so that equal cuts can be made in the corners. mark the batten where the first tile will be placed. |
Step 4: Use selected adhesive. With the straight edge of a DTA notched trowel, spread the adhesive on the wall. |
 |
 |
Step 5: In a horizontal direction, notch the adhesive with the appropriate DTA notched trowel. |
Step 6: Start tiling at the mark placed at the bottom of Step 3, placing tiles horizontally. If tile spacers are used, remove before grouting. |
 |
 |
Step 7: Check tiling regularly with a spirit level to keep work straight. Ensure that good contact with the adhesive is made. |
Step 8: After adhesive has set, remove batten and fill in bottom row. |